Documentation Phase Manager 3.0

User Tools

Site Tools


en:21-nouveaute_v5:01-synthese-des-nouveautes

Overview of Version 7.2 new features

Major changes

New map system

  • With Phase Manager 7.2 you can now use a new map system using IGN (France), Open Street Map ans ESRI maps. You can superimposed 2 maps and create a personnal view of your phasing

Phasing with Time Details

  • You can create a phasing book by setting a periodicity for your pages

Action buttons for areas and Axes

1. Show / Hide2. Put on upper layer
3. Put on lower layer4. Lock the position
5. Spread6. Object coulours
7. Edit8. Delete

Rounded corner on shapes

  • You can now set rounded corner in properties of each object :

Group of connected objects

  • The new design for manage groups of connected object makes it simpler.
    by clicking on an object, create a groupe from this one and add others.

Lock activities to use them as a Timed constraint

  • Lock an activity to avoid it to have its dates modified when rescheduling and then manage it like a constraint.
    Click on the Lock button a the left bottom in the activity editing window

Research by typing in the column name

  • Double-click on the column name (like Name, Category… Except in Gantt) for search a specitic value

Perpetual display for objects / Areas on your drawing

  • Set the perpetual display for an area, axis or object on your drawing in your representation settings

Reinitialize the PK's axis

  • From a righ-click on the axis, reinitialize all KP easily.

New editing interface for connected objects

  • Like areas and axes, modify the connected object or icons properties in the editiion window

Import / Export

Those new data can now be imported :

  • Printing areas
  • Activities and connected object association
  • Axes and mobile picto association
  • Area list with tree structure and associated categories
  • KML with connected polygons and polylines
  • KML : Texts added

Other evolutions

  • Highlighting an area name in the list when selected on the map and vice versa
  • Displaying print area (color and name) on Live View and deliverables
  • Reorganizing print areas (tree structure)
  • Filtering connected objects and their groups
  • Deleting activities from a tree level
  • Deleting area/activity assignments from an area or activity
  • Updating area settings upon import
  • Saving multi-window positions
  • Dynamic modification of a color in the Gantt chart
  • Variable axis thickness depending on the activity status
  • Customizing area outlines
  • Label positioning
  • Performance improvement (RAM usage)

Previous Developments (v7.0)

1. Area Categories
2. New Features in Live View's EDIT mode
3. New information that can be added to your timeline:

- Dynamic Timeline:
- Sound Integration
- Text Integration
- Automatic Deliverable Generation

4. A Complete Interface Redesign
- Light Mode / Dark Mode
- Tab/Window Detachment
- Redesigned Connected Objects tab in “Design”
- Simplified Deliverables * New Deliverable Creation Interface
Other

1. Changed behavior when adding activities in the Gantt chart
2. Dynamically updated colors in the Gantt chart
3. Standardized field behavior for deliverable activities
4. New file format and ability to associate it with the application for direct launch from Windows